Skip to content

2024 03 06_meeting

Michael Wetter edited this page Mar 6, 2024 · 2 revisions

SOEP Coordination meeting

Date: March 6, 2024, 8:15am-9am Pacific Times

The purpose of this meeting is to coordinate the Modelica integration for SOEP.

Meeting information

Join from PC, Mac, Linux, iOS or Android: https://lbnl.zoom.us/my/mwetter

Or iPhone one-tap (US Toll): +14086380968,6614042296# or +16465588656,6614042296#

Or Telephone:
Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) Meeting ID: 661 404 2296 International numbers available: https://lbnl.zoom.us/zoomconference?m=_h5BuJ686mPy3rWEyKf4NROxLaeOV5J8

Agenda

  1. Previous action items
  2. AOP alignment
  3. OpenStudio integration
  4. Modelon
  5. Compiler integration
  6. Stuart: FMI-QSS
  7. Modelica Buildings Library
  8. Kyle, Michael: EnergyPlus-Modelica coupling.
  9. Other items

Participants

Kyle Benne
Karthik Devaprasad
Stuart Mentzer
Michael Wetter

Minutes

AOP alignment

LBNL: By 3/31/24, spec and proof of concept for semantic model to CDL export via templates.
LBNL: By 3/30/24, released Modelica Buildings Library with templates for heat pump plants.
LBNL: By 6/30/24, released Modelica Buildings Library that gets autosizing data from EnergyPlus.
NREL: By 6/28/24, published release that includes auto-sizing.
LBNL: By 9/30/24, demonstrated OpenStudio workflow from Spawn.

OpenStudio integration

Coordination call scheduled.

Modelon

Michael testing latest OCT.

Compiler integration

No work lately.

FMI-QSS

Stuart working on setting up benchmarking.

Modelica Buildings Library

Backlog on fixing various issue.

See https://github.com/ibpsa/modelica-ibpsa/pull/1628 for heat pump EER vs COP.

PNNL has milestones for end of FY for heat pump water heater.

ORNL has dehumidifier as deliverable end of this month. Sen to send slides.

EnergyPlus-Modelica coupling

Spawn related PR at https://github.com/lbl-srg/modelica-buildings/projects/2

Update to EnergyPlus 24.1.0, after 10.0.0 release and fixes of some spawn issues below.

Michael blocked March 26 to prepare release 9.x and 10.x (backward compatible changes). Target for backward compatible E+ changes is Wed 3/13, Michael to test 3/14.

Issues are at https://github.com/lbl-srg/modelica-buildings/issues?q=is%3Aissue+is%3Aopen+label%3Aspawn

Next, work on https://github.com/lbl-srg/modelica-buildings/projects/2

OS compatibility matrix is at https://github.com/NREL/OpenStudio/wiki/OpenStudio-SDK-Version-Compatibility-Matrix

Kyle to work on the Spawn issues.

Negative start time, start day of the week, and initialization for non-zero start time are handled as one fix as they are somewhat related.

What if startTime is changed programmatically? EnergyPlus start time corresponds to Jan 1, e.g., Modelica time 0. For users, RunPeriod user entries of original idf file are ignored.

Other items

None.

New action items

None.

Previous action items

None.

Clone this wiki locally