-
Notifications
You must be signed in to change notification settings - Fork 189
Triage Meetings: April 5 & 7, 2022. Release 3.0.0 alpha
Diana edited this page Apr 8, 2022
·
1 revision
- Diana Belokon
- Thanh Van
- #3373 - needs one more review, and Tue needs to improve on the feedback
- #3371 - Draft, Tim is going to follow up with the improved code after code reviews
- #3363 - assigned 4 reviewers
- #3420 - needs reviews, waiting for James to respond to the code reviewers. Not passing lint, need to do some formatting fixing
- #3419 - lots of feedback, Tue will follow up with the requested changes
- #3418 - Needs a meeting for more discussion (Kevan, Dave + anyone who is interested in Database, Prisma stuff)
- #3417 - assigned reviewers
- #3416 - needs one more review from Tue
- #3414 - needs reviews, added a few more people to do the review
- #3413 - Tue is going to follow up with the changes based on the requested changes
- #3411 - Draft
- #3405 - Jerry clarified some things with Dave, should be good to finish the PR
- #3404 - just one more review is needed. Assigned one reviewer. It is basically done.
- #3371 - Draft, needs more time, because it is being hold up by the legacy backend PR thingy
- #3363 - still needs one more review, should be good to go
- #3335 - Draft, needs a lot of debugging, moved to Release 3.0. Tricky bug
- #3307 - moved to Release 3.0
- Release 3.0 is pushed to be released on April 21st.
- Tried doing live reviews, kind of cool and makes it easier to review when the person who wrote the code goes through it and you can ask questions right away. Might be time consuming though, so we have to find a way to go through more PRs like that.
- Some issues must be fixed before 3.0.
- Did the demo for big PRs - Roxanne did the demo for 3416, 3414. Tue did a demo for 3413.
- Every 10 lines of code add another bug
- Finish everything that you started (main features that you owned, etc)
- Write a documentation/make a video or some sort of guide so that after you leave, others will know how to navigate easily.
- If you can’t finish something that you own, file issues for what’s left to be done.
Priorities
3.0 Milestone
3.0 Areas of interest by people
3.0 Discussion
Latest Triage meeting:
Older Triage meetings:
-
Add meetings to this list as they happen