Skip to content

Pull requests: openshift/cluster-kube-apiserver-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

WIP OCPBUGS-44842: Bump library-go to cert-annotations-not-before-not-after branch approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1768 opened Nov 21, 2024 by vrutkovs Loading…
API-1844,API-1845: WIP: [KMS] Image reference render aws-kms-encryption-provider payload image do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1766 opened Nov 14, 2024 by swghosh Draft
API-1689: TLS registry: add description approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1763 opened Nov 4, 2024 by vrutkovs Loading…
AUTH-541: OIDC structured auth config jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. qe-approved Signifies that QE has signed off on this PR
#1760 opened Oct 28, 2024 by liouk Loading…
OCPBUGS-43777: certrotationcontroller: run tests which runs deployment and creates projects approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1759 opened Oct 24, 2024 by vrutkovs Loading…
WIP add support for minimumKubeletVersion do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1754 opened Oct 14, 2024 by haircommander Loading…
Update library-go needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1753 opened Oct 11, 2024 by rexagod Loading…
WIP: update library-go approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1752 opened Oct 8, 2024 by dgrisonnet Loading…
WIP: add installerController rollout duration metric approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1748 opened Oct 3, 2024 by dgrisonnet Loading…
WIP: bindata/alerts/slo: improve burnrate calculation approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1744 opened Sep 26, 2024 by dgrisonnet Loading…
OCPBUGS-42083: Disregard health endpoints in the burn rate alerts approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/severity-important Referenced Jira bug's severity is important for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1742 opened Sep 26, 2024 by dgrisonnet Loading…
WIP installer pods: remove magic 30 sec sleep approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1740 opened Sep 26, 2024 by vrutkovs Loading…
disable lending for the priority level used by our operators approved Indicates a PR has been approved by an approver from all required OWNERS files.
#1734 opened Sep 16, 2024 by tkashem Loading…
WIP: Scrape SLI metrics approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1725 opened Aug 27, 2024 by dgrisonnet Loading…
certrotationcontroller: use minutes instead of days when FeatureShortCertRotation is enabled approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale.
#1718 opened Jul 30, 2024 by vrutkovs Draft
WIP: cert-rotation: use new-style cert rotation controllers approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1712 opened Jul 9, 2024 by vrutkovs Draft
NO-JIRA: Rename Dockerfile do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1711 opened Jul 3, 2024 by ashwindasr Loading…
bootkube: create openshift-config / openshift-config-managed namespaces approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1708 opened Jul 1, 2024 by vrutkovs Draft
OCPBUGS-34545: Remove cloud-config and cloud-provider arguments jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1696 opened May 31, 2024 by nrb Loading…
OCPBUGS-35343: make shutdown-delay-duration configurable approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1685 opened May 21, 2024 by tkashem Loading…
OCPBUGS-34525: Add "check-api-lb" subcommand approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1678 opened May 14, 2024 by vrutkovs Loading…
WIP API-1802: Remove RefreshOnlyWhenExpired, run cert-rotation controller as sidecar to the operator approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1669 opened Apr 25, 2024 by vrutkovs Loading…
API-1701: [PoC] Encryption with KMS do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1625 opened Jan 17, 2024 by swghosh Draft
Updating ose-cluster-kube-apiserver-operator images to be consistent with ART backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager.
#1365 opened Jul 6, 2022 by openshift-bot Loading…
ProTip! Follow long discussions with comments:>50.