Network v19 Scope and Upgrade Timeline #123
-
Creating this async discussion for core devs to start to propose ntwk v19 upgrades scope. High-level theme/priority of the network upgrade, what protocol change we wanna bring to the network, and what use case do we wanna focus on enabling? |
Beta Was this translation helpful? Give feedback.
Replies: 4 comments 47 replies
-
ScopeFIPs that are being considered
|
Beta Was this translation helpful? Give feedback.
-
TimelineCurrently targeted at early Q2. March 20th update- targeted timeline
|
Beta Was this translation helpful? Give feedback.
-
Network upgrade nameProposing Lightning ⚡ - smaller cron -> faster validation! |
Beta Was this translation helpful? Give feedback.
-
Hey core devs nv19 includes FIP 0060 which will greatly reduce block sync times. Due to the recent degraded chain quality, the lotus team is advising an expedited nv19 to land this change sooner. Long block sync times continue to create problems that present in various ways throughout the network. The latest seemingly related problem is a delay in block production that is causing a decrease in chain quality. Concretely this means (1) SPs are missing blocks and losing out on revenue and (2) chain message bandwidth is significantly reduced. Note that long block sync times are probably not the only contributing factor and it is still only a hypothesis that they are a significant factor. However we have enough confidence in the hypothesis that reducing block sync time will significantly improve chain quality that it appears worth the cost to expedite the nv19 upgrade. In order to expedite safely we need to reduce the scope of the upgrade to make up for the shorter testing and node update period. To do this we are advising:
Code for this descoped upgrade is currently under test and found here: filecoin-project/lotus#10681 |
Beta Was this translation helpful? Give feedback.
Finalizing the nv19 will be the Lightning Upgrade ⚡ and nv20 will be the Thunder Upgrade 🌧️