Skip to content

Commit

Permalink
✨ correct reviewers stage details
Browse files Browse the repository at this point in the history
  • Loading branch information
ctcpip committed Nov 13, 2024
1 parent 1dd98fc commit f7d2ecb
Showing 1 changed file with 2 additions and 2 deletions.
4 changes: 2 additions & 2 deletions index.html
Original file line number Diff line number Diff line change
Expand Up @@ -180,9 +180,9 @@ <h2>Spec text</h2>

<h2>Reviewers</h2>

<p>Anyone can be a reviewer and submit feedback on an in-process addition. The committee should identify designated reviewers for acceptance during the “draft” (stage 2) maturity stage. These reviewers must give their sign-off before a proposal enters the “candidate” (stage 3) maturity stage. Designated reviewers should not be authors of the spec text for the addition and should have expertise applicable to the subject matter. Designated reviewers must be chosen by the committee, not by the proposal's champion.
<p>Anyone can be a reviewer and submit feedback on an in-process addition. The committee should identify designated reviewers for acceptance during Stage 2. These reviewers must give their sign-off before a proposal enters Stage 2.7. Designated reviewers should not be authors of the spec text for the addition and should have expertise applicable to the subject matter. Designated reviewers must be chosen by the committee, not by the proposal's champion.

<p>When reviewers are designated, a target meeting for Stage 3 should be identified. Initial reviewer feedback should be given to the champions two weeks before that meeting to allow for a back-and-forth ahead of the meeting. The target Stage 3 meeting may be delayed by a champion outside of the meeting at a later time if it is not ready.
<p>When reviewers are designated, a target meeting for Stage 2.7 should be identified. Initial reviewer feedback should be given to the champions two weeks before that meeting to allow for a back-and-forth ahead of the meeting. The target Stage 2.7 meeting may be delayed by a champion outside of the meeting at a later time if it is not ready.

<h2>Calls for implementation and feedback</h2>

Expand Down

0 comments on commit f7d2ecb

Please sign in to comment.