[#5947] fix(auth): It will throw error if we enable authorization and… #46
Annotations
8 errors and 1 warning
build (8)
Canceling since a higher priority waiting request for 'build-refs/heads/branch-0.7' exists
|
build (8)
The operation was canceled.
|
build (17)
Canceling since a higher priority waiting request for 'build-refs/heads/branch-0.7' exists
|
build (17)
The operation was canceled.
|
spark-connector-build
Canceling since a higher priority waiting request for 'build-refs/heads/branch-0.7' exists
|
spark-connector-build
The operation was canceled.
|
build (11)
Canceling since a higher priority waiting request for 'build-refs/heads/branch-0.7' exists
|
build (11)
The operation was canceled.
|
changes
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|