You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
It's 5 times the amount is should be. Removing 1 drone (so projecting 4) projects at about 4 times the amount. So it seems that somewhere the number of drones is getting multiplied twice.
I can't find the EV drones listed in the affected by tab, so not sure where that's happening at....
The text was updated successfully, but these errors were encountered:
To replicate:
Use this fit:
[Taipan, EV Drones]
Acolyte EV-300 x5
Infiltrator EV-600 x5
Praetor EV-900 x5
Project the ship back on itself.
Projected amount (based on maths and drone bay side, which is correct) should be:
5 lights -4.165 GJ/s, 5 mediums -8.35 GJ/s, and 5 heavies -20.8 GJ/s
Actual amounts projected:
5 lights give -20 GJ/s, 5 mediums give -41.7 GJ/s, and 5 heavies gives -104 GJ/s
Example:
http://puu.sh/p0Cq9/de0ef76fc1.png
It's 5 times the amount is should be. Removing 1 drone (so projecting 4) projects at about 4 times the amount. So it seems that somewhere the number of drones is getting multiplied twice.
I can't find the EV drones listed in the affected by tab, so not sure where that's happening at....
The text was updated successfully, but these errors were encountered: