Austin's Weekly Documentation Update #7

Merged
merged 39 commits into from
Jun 29, 2024
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
Show all changes
39 commits
Select commit Hold shift + click to select a range
53c4588
Update .DS_Store
aduong18 Jun 24, 2024
a56f8e8
RBF switch update
aduong18 Jun 24, 2024
0e84cf2
update
aduong18 Jun 24, 2024
527ec9f
deleted
aduong18 Jun 24, 2024
8a21abc
chapter 5
aduong18 Jun 24, 2024
a9cbd8c
Update Chapter_1.md
NicoleMaggard Jun 24, 2024
16e57f9
Merge branch 'Austin' of https://github.com/proveskit/Documentation i…
NicoleMaggard Jun 24, 2024
41b3ecf
update
aduong18 Jun 24, 2024
123a53d
Merge branch 'Austin' of https://github.com/proveskit/Documentation i…
aduong18 Jun 24, 2024
171b906
Update Chapter_6.md
NicoleMaggard Jun 24, 2024
975b0c8
UPDATE
NicoleMaggard Jun 24, 2024
ed40191
Update Chapter_2.md
NicoleMaggard Jun 24, 2024
66cf4d9
update
NicoleMaggard Jun 24, 2024
f69798e
Update Chapter_3.md
NicoleMaggard Jun 24, 2024
e7fac3a
Update Chapter_4.md
NicoleMaggard Jun 24, 2024
11fe6cb
battery testing
aduong18 Jun 24, 2024
1f22ffa
fix
NicoleMaggard Jun 24, 2024
172a61e
Merge branch 'Austin' of https://github.com/proveskit/Documentation i…
NicoleMaggard Jun 24, 2024
02b95bb
chapter 6
aduong18 Jun 24, 2024
cdd5d4f
chart update
aduong18 Jun 24, 2024
06ef89c
update
NicoleMaggard Jun 24, 2024
01a2520
Chapter 5
yoursherwin Jun 24, 2024
38dd9c5
Chapter 2 Photos
PragunB Jun 24, 2024
26cc700
update-sherwin
yoursherwin Jun 25, 2024
653d1ea
Merge branch 'Austin' of https://github.com/proveskit/Documentation i…
yoursherwin Jun 25, 2024
869a377
update-sherwin
yoursherwin Jun 25, 2024
0c54c0f
update
yoursherwin Jun 25, 2024
60e8aed
chapter 2 update
aduong18 Jun 25, 2024
a3d3c58
name
aduong18 Jun 25, 2024
c70ecf5
Update_Chapter2
josec0007 Jun 25, 2024
2331aa7
image
aduong18 Jun 25, 2024
00b3103
Update_Chapter2
josec0007 Jun 25, 2024
a587aa2
image
aduong18 Jun 25, 2024
abd0362
Update_Chapter2
josec0007 Jun 25, 2024
1b3b5f2
tiny updates
NicoleMaggard Jun 28, 2024
dc6aaac
Merge branch 'Austin' of https://github.com/proveskit/Documentation i…
NicoleMaggard Jun 28, 2024
fe58fd6
Update Chapter_5.md
NicoleMaggard Jun 28, 2024
b054e5e
Update Chapter_1.md
NicoleMaggard Jun 28, 2024
eeb5a56
Merge branch 'main' into Austin
Mikefly123 Jun 29, 2024
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
57 changes: 40 additions & 17 deletions docs/Assembly_Guide_V2/Chapter_1.md
Original file line number Diff line number Diff line change
@@ -1,37 +1,60 @@
# Chapter 1: Battery Board Assembly
In this chapter, the user will learn the proper steps to assemble an Electrical Power System (EPS) board. The steps can be followed again to create an optional ballast to add weight to the satellite, or while not recommended, additional power to the satellite.
In this chapter, the user will learn the proper steps to assemble an Electrical Power System (EPS) board. **These steps can be followed again to create an optional ballast. These instructions are included below.**

!!!Warning
***Before continuing:** it is important to note that gloves should be worn when soldering and it should be done in a well-ventilated area to avoid the harmful fumes.*</span>


## Soldering the Relay
1. Align the relay onto the white box by the top left corner of the battery board. Make sure the dot on the top side of the relay is closest to the slot hole as seen as figure 1.1
![Figure 1-1](images/8-1.jpg)
*<p align="center">Figure 1.1: Flight Controller Board </p>*
**1.** Align the relay onto the white outline by the top left corner of the battery board.

2. The Relay on the EPS board has through hole connections that will need to be soldered to on the bottom side as seen in Figure 1.2
![Figure 1-2](images/RELAY.png)
*<p align="center">Figure 1.2 </p>*
**2.** On the top side of the relay there is a dot that must be aligned to the slot hole as seen in Figure 1.1

*<p align="center">**Figure 1.1: Flight Controller Board** </p>*

**3.** On the bottom side of the EPS board there are through connections where the Relay must be sodered as seen in Figure 1.2

3. The sodering should not be flush to the board,rather there should be enough so that the relay's legs bend and it will be allowed to lay on it's side. This can be seen in figure 1.3 and is also stated on the board.
![Figure 1-2](images/relaylegs.jpeg)
*<p align="center">Figure 1.3: </p>*



*<p align="center">**Figure 1.2** </p>*



**4.** The sodering **should not** be flush to the board, rather there should be room for the relay's legs bend which will allow it to lay on it's side. This is stated on the board and is shown figure 1.3

*<p align="center">**Figure 1.3**: </p>*
![Figure 1-2](images/RELAY.png)


## Soldering the Battery Holders
<div class="result" markdown>
-1. Insert the battery holders into the board from the backside.

-2. Solder the through hole battery terminals on the top side of the EPS as seen in Figure 1.5
*<p align="center">Figure 1.5: </p>*
**1.** Insert the battery holders into the board from the backside.

**2**. Solder the through hole battery terminals on the top side of the EPS as seen in Figure 1.5
*<p align="center">**Figure 1.5:** </p>*
![Figure 1-5](images/BB.jpeg)

## **OPTIONAL**: Ballast Board creation
<div class="result" markdown>
1. Follow all of the prior steps to create a secondary EPS
2. If additional power is desired for the satellite, a wire can be soldered to the Pack+ Test point between both boards, and a wire can be soldered to the B- Test point between both boards.



**1.** Follow all of the prior steps to create a secondary EPS

!!!WARNING
It is not recommended that additional power be added to this satellite
**2.** If additional power is desired for the satellite, a wire can be soldered to the Pack+ Test point between both boards, and a wire can be soldered to the B- Test point between both boards.

*<p align="center">**Figure 1.6:** </p>*
</div>

## Check your work
If all steps were followed correctly, the EPS should appear as it does in Figure 1.6. (notwe that this should show both the front and back)
</div>
If all steps were followed correctly, the EPS should appear as it does in Figure 1.7.

!!!Note
This does not include the secondary EPS or additional power modifications stated above

*<p align="center">**Figure 1.7:** </p>*

105 changes: 66 additions & 39 deletions docs/Assembly_Guide_V2/Chapter_2.md
Original file line number Diff line number Diff line change
Expand Up @@ -7,65 +7,92 @@ In this chapter the user will learn the steps to assemble a foot switch. A minim

## Make 4-6 Jumped 2 Position Pico-Lock Cable Assemblies
<div class="result" markdown>
1. 300mm 5 position Pico-Lock cable assemblies have been included in the kit as well as 2 position connectors. The 100mm assemblies will be used for connecting the solar boards to the EPS, and the 300mm assemblies will be used to create all the needed 2 position Pico-Lock assemblies. The first step will require taking a cable out of the 300mm 5 position assembly. To start, take the needle nose tweezers and lift the locking mechanism as seen in Figure 2.1 and pull the cable from each connector housing.
2. Take the freed cable and insert both ends into one 2 position connector housing as seen in Figure 2.2
<p align="center">Figure 2.2: </p>

!!! Note
300mm 5 position Pico-Lock cable assemblies have been included in the kit as well as 2 position connectors. The 100mm assemblies will be used for connecting the solar boards to the EPS, and the 300mm assemblies will be used to create all the needed 2 position Pico-Lock assemblies.

**1.** The first step will require taking a cable out of the 300mm 5 position assembly. To start, take the needle nose tweezers and lift the locking mechanism as seen in Figure 2.1 and pull the cable from each connector housing.

*<p align="center">**Figure 2.1:**</p>*
![Figure 2-1](images/PicolockAssemblies.PNG)

**2.** Take the freed cable and insert both ends into one 2 position connector housing as seen in Figure 2.2

*<p align="center">**Figure 2.2:**</p>*
![Figure 2-2](images/Jumped_2position.PNG)


</div>

!!!note
The steps are similar for creating the non-jumped cables required for the burn wire and direct charging ports. The primary difference is that two cables will be required as well as 2 connector housings. The non-Jumped assemblies can be seen in Figure 2.3
The steps are similar for creating the non-jumped cables required for the burn wire and direct charging ports. The primary difference is that two cables will be required as well as 2 connector housings.



<p align="center">Figure 2.3: </p>

## Solder the Jumped Pico-Lock Assemblies to the switches
<div class="result" markdown>
1. Take jumped assembly and cut in half as seen in Figure 2.4
<p align="center">Figure 2.4: </p>
2. Strip ends of assembly wires
3. Slide heat shrink tubing down each wire
4. Wrap wires around leads 1 and 3 respectively as seen in Figure 2.5
<p align="center">Figure 2.5: </p>
5. Solder wires to switch leads
6. Move heat shrink tubing up and use hot air to shrink tubing around switch leads
7. Repeat these steps to create 2-4 foot switches and 1 RBF switch

**1.** Take jumped assembly and cut in half as seen in Figure 2.3
![Figure 2-3](images/Cutting_Jumped_2pos.PNG)

*<p align="center">**Figure 2.3**</p>*
**2.** Strip ends of assembly wires
**3.** Slide heat shrink tubing down each wire
**4.** Wrap wires around leads 1 and 3 respectively as seen in Figure 2.4
*<p align="center">**Figure 2.4** </p>*
![Figure 2-4](images/PicolockAssemblies.PNG)
**5.** Solder wires to switch leads
**6.** Move heat shrink tubing up and use hot air to shrink tubing around switch leads
**7.** Repeat these steps to create 2-4 foot switches and 1 RBF switch

</div>

## Solder the Battery Heater Assembly
<div class="result" markdown>
1. Take jumped assembly and cut in half as seen in Figure 2.4
2. Strip ends of assembly wires
3. Slide heat shrink tubing down each wire
4. Strip ends of battery heater leads
5. Wrap wires around leads as seen in Figure 2.6
<p align="center">Figure 2.6: </p>
6. Solder wires to heater leads
7. Move heat shrink tubing up and use hot air to shrink tubing around heater leads

**1.** Take jumped assembly and cut in half as seen in Figure 2.4
**2.** Strip ends of assembly wires
**3.** Slide heat shrink tubing down each wire
**4.** Strip ends of battery heater leads
**5.** Wrap wires around leads as seen in Figure 2.5

*<p align="center">**Figure 2.5** </p>*
![Figure 2-5](images/wirewrapping.PNG)
**6.** Solder wires to heater leads
**7.** Move heat shrink tubing up and use hot air to shrink tubing around heater leads
</div>

## Create Foot Switch Assemblies
<div class="result" markdown>
1. Insert the M2x20 bolts into the holes of the non-embedded feet as seen in Figure 2.7
<p align="center">Figure 2.7: </p>
2. With the bolt inserted, apply some Loctite to the bolt on the opposite end
3. Holding the bolt in place with a Philips head screwdriver, insert the M2 lock nut into the opposite end of the foot and tighten the nut partially without allowing the bolt to go completely through the lock nut as seen in Figures 2.8 and 2.9
<p align="center">Figure 2.7 and Figure 2.8: </p>
4. Prepare a small amount of space rated glue
5. Apply the glue to the inside of the foot on the areas shown in Figure 2.10
<p align="center">Figure 2.10: </p>
6. Insert the switch into the foot as seen in Figure 2.11
<p align="center">Figure 2.11: </p>
7. Repeat steps for all foot switches
8. Insert all foot switch assemblies into the reflow oven and bake at 185C this will help cure the glue faster.
9. Let rest for an additional hour

**1.** Insert the M2x20 bolts into the holes of the non-embedded feet as seen in Figure 2.6

*<p align="center">**Figure 2.6** </p>*
![Figure 2-6](images/footswitch1.PNG)
**2.** With the bolt inserted, apply some Loctite to the bolt on the opposite end
**3.** Holding the bolt in place with a Philips head screwdriver, insert the M2 lock nut into the opposite end of the foot and tighten the nut partially without allowing the bolt to go completely through the lock nut as seen in Figures 2.7 and 2.8

*<p align="center">**Figure 2.7 and Figure 2.8** </p>

**4.** Prepare a small amount of space rated glue
**5.** Apply the glue to the inside of the foot on the areas shown in Figure 2.9

*<p align="center">**Figure 2.9** </p>*
**6.** Insert the switch into the foot as seen in Figure 2.10
*<p align="center">**Figure 2.10** </p>*
**7.** Repeat steps for all foot switches
**8.** Insert all foot switch assemblies into the reflow oven and bake at 185C this will help cure the glue faster.
**9.** Let rest for an additional hour
</div>

## Create RBF Switch assembly
<div class="result" markdown>
1. Insert RBF switch into holder as seen in Figure 2.12
<p align="center">Figure 2.12: </p>
2. Insert and fasten M2.5x8 or M2.5x10 bolts into the 3d printed side. The assembly can be seen in Figure 2.13
<p align="center">Figure 2.13: </p>

**1.** Insert RBF switch into holder as seen in Figure 2.11

*<p align="center">**Figure 2.11** </p>*
**2.** Insert and fasten M2.5x8 or M2.5x10 bolts into the 3d printed side. The assembly can be seen in Figure 2.12

*<p align="center">**Figure 2.12** </p>*
</div>
27 changes: 15 additions & 12 deletions docs/Assembly_Guide_V2/Chapter_3.md
Original file line number Diff line number Diff line change
Expand Up @@ -14,7 +14,7 @@ In this chapter, the user will learn how to properly assembly the PROVES Z- Face

**1.** Apply Low Temperature Solder Paste to the pads on the Solar Board as seen in Figure 3.1.

<p align="center">Figure 3.1: Z- Face Solar Board Preparation</p>
*<p align="center">**Figure 3.1: Z- Face Solar Board Preparation**</p>*

**2.** Check that the positive and negative terminals on the back side of the cells are matched with the plus and minus silk screened on the PCB.

Expand All @@ -34,10 +34,10 @@ In this chapter, the user will learn how to properly assembly the PROVES Z- Face

**1.** Get five 5 pin connectors and align them onto the white rectangular outline as seen in Figure 3.2 and 3.3. Ensure that the pins are aligned to the copper pads.
![Figure 3-2](images/5pinface1.jpeg)
*<p align="center">Figure 3.2: Face 1 and Face 2 5-pin headers*
*<p align="center">**Figure 3.2: Face 1 and Face 2 5-pin headers**</p>*

![Figure 3-3](images/5pinface2.jpeg)
*<p align="center">Figure 3.3: Face 0, Face 3 and Solar Breakout 5-pin headers*
*<p align="center">**Figure 3.3: Face 0, Face 3 and Solar Breakout 5-pin headers**</p>

**2.** Tape down the 5-pin header with tape to ensure it does not move while you solder it on.

Expand Down Expand Up @@ -65,22 +65,25 @@ In this chapter, the user will learn how to properly assembly the PROVES Z- Face
!!!Note
If your XY Face does not come with 5 pin headers installed, follow this section on how to properly solder them on. Otherwise, you can skip this section

a. Follow the silkscreen pattern on the board to place the components in the correct positions/orientations. For the pico-lock connectors line up the mounting pads when soldering connectors.
**1**. Follow the silkscreen pattern on the board to place the components in the correct positions/orientations. For the pico-lock connectors line up the mounting pads when soldering connectors.

!!! warning
Test all sensors for full functionality prior to solar cell installation (see Chapter 7 that identifies the proper test to complete for the solar boards). If sensors are faulty and need to be reflowed or removed with a heat gun, the cells will be damaged in the process.

2. **Install the Solar Cells (KXOB101K08F-TR) using low temperature solder paste and a reflow oven.**
a. Apply Low Temperature Solder Paste to the pads on the Solar Board as seen in Figure 3.3.
<p align="center">Figure 3.3: Before and After Solder Paste Application</p>
b. Check that the positive and negative terminals on the back side of the cells are matched with the plus and minus silk screened on the PCB (Note: you cannot tell the orientation of the cell from the top of the cell so make sure it is placed properly).
**2.** **Install the Solar Cells (KXOB101K08F-TR) using low temperature solder paste and a reflow oven.**
**a.** Apply Low Temperature Solder Paste to the pads on the Solar Board as seen in Figure 3.3.
*<p align="center">**Figure 3.3: Before and After Solder Paste Application**</p>*
**b.** Check that the positive and negative terminals on the back side of the cells are matched with the plus and minus silk screened on the PCB

c. For cells that are immediately next to each other, scoot them together so that the gap between them is as small as possible. Otherwise, the fishing wire to stow the antenna may get caught in the cracks.
!!!WARNING
You **cannot** tell the orientation of the cell from the top of the cell so make sure it is placed properly.

**c.** For cells that are immediately next to each other, scoot them together so that the gap between them is as small as possible. Otherwise, the fishing wire to stow the antenna may get caught in the cracks.

## Optional: Motor Driver Modification
3. **OPTIONAL: Remove 0 ohm resistor for motor driver as seen in Figure 3.4S**
a. If the solar board has already been removed from the oven, the resistor can be removed by a fine tip soldering iron heating each pad simultaneously. If the board is still hot from the oven, tweezers can be used very swiftly to remove the resistor.
<p align="center">Figure 3.4: Motor Driver Resistor Removal</p>
**3.** **OPTIONAL: Remove 0 ohm resistor for motor driver as seen in Figure 3.4S**
**a.** If the solar board has already been removed from the oven, the resistor can be removed by a fine tip soldering iron heating each pad simultaneously. If the board is still hot from the oven, tweezers can be used very swiftly to remove the resistor.
*<p align="center">**Figure 3.4: Motor Driver Resistor Removal**</p>*

!!! Note
The Motor Driver Modification step is completely optional as the magnetorquers can be deactivated in software. Only one X Magnetorquer and one perpendicular Y Magnetorquer need to remain active in order to detumble the satellite effectively. The Z- Solar board should let the magnetorquer coil remain active as this is the only coil on the Z faces.
Expand Down