db upgrage: upgrade postgres 15 to postgres 16 #4493
run_ci.yml
on: pull_request
run-tests
1h 30m
run-cli-tests
1h 30m
run-core-config-map-tests
1h 30m
Annotations
6 errors and 3 warnings
run-tests
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 90 minutes.
|
run-tests
The operation was canceled.
|
run-cli-tests
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 90 minutes.
|
run-cli-tests
The operation was canceled.
|
run-core-config-map-tests
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 90 minutes.
|
run-core-config-map-tests
The operation was canceled.
|
run-tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
run-cli-tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
run-core-config-map-tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|