You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Install single TORS in R2-PC-C21 and configure uplink
Review this plan with NERC admins and Nick Amento
Maintenance Tasks
NERC ADMINS: Bring down all services gracefully
Move core uplink to Harvard from MOC-CORE to NERC-CORE
Add link from MOC-CORE to NERC-CORE for NERC VLANs
Move uplink for R8-PA-C23 from MOC-CORE to NERC-CORE (R6-PB-C02) - Cable already in rack, just port swap
Move uplink for R1-PC-C20 from Harvard aggregation to NERC-CORE (R6-PB-C02) - Cable already in rack, just port swap
Remove 2x Harvard switches in R2-PB-C06
Install 2x Dell S5048-ON switches in R2-PC-C06 to replace existing switches
Move uplink for R2-PC-C06 from Harvard aggregation to NERC-CORE (R6-PB-C02) - Cable already in rack, just port swap
Move equipment from R7-PC-C03 to R2-PC-C21 and cable up with new switch in R2-PC-C21
NERC ADMINS: Bring up all services and verify all networks are behaving the same (maintenance should be transparent from the perspective of NERC hardware)
Support
One other person on-site would be good to help with moving stuff around (Techsquare?)
Nick Amento is available for remote support for anything relating to networking
The text was updated successfully, but these errors were encountered:
Purpose
Maintenance Timeframe / Affected Clusters
All NERC Clusters (Openstack and Openshift)
1/7/2025 9 AM Eastern Time to 1/8/2025 9 AM Eastern Time
Pre-Maintenance Tasks
Maintenance Tasks
Support
The text was updated successfully, but these errors were encountered: