Fixing prep release pipeline #2975
pipeline.yaml
on: pull_request
Matrix: test
Matrix: integration-test
finish-coveralls
0s
Annotations
12 errors
integration-test (3.10)
The run was canceled by @mrchtr.
|
integration-test (3.10)
The operation was canceled.
|
integration-test (3.11)
The run was canceled by @mrchtr.
|
integration-test (3.11)
The operation was canceled.
|
test (3.9)
The run was canceled by @mrchtr.
|
test (3.9)
The operation was canceled.
|
test (3.10)
The run was canceled by @mrchtr.
|
test (3.10)
The operation was canceled.
|
integration-test (3.9)
The run was canceled by @mrchtr.
|
integration-test (3.9)
The operation was canceled.
|
test (3.11)
The run was canceled by @mrchtr.
|
test (3.11)
The operation was canceled.
|