Skip to content
This repository has been archived by the owner on Aug 28, 2024. It is now read-only.

🚀 Chart Configuration #28

Draft
wants to merge 30 commits into
base: main
Choose a base branch
from
Draft

🚀 Chart Configuration #28

wants to merge 30 commits into from

Conversation

Gary-H9
Copy link
Contributor

@Gary-H9 Gary-H9 commented Jul 22, 2024

This PR forms part of this piece of work. In short, it aims to configure the repository to allow us to deploy the ollamate application to the analytical-platform-compute EKS cluster. This includes the building of a container which will be deployed, as well as associated Makefile commands that allow for easy creation/testing etc.

As part of this PR the beginnings of python testing have been added, though no actual tests of consequence have been added - see tests pytest.ini etc

This PR:

  • down grades two packages mypi + pre-commit which had dependency issues when upgraded. This will be resolved per their dependabots.
  • alters max-line-length 100 -> 150
  • devcontainer scripts have been moved to .devcontainer
  • delete scripts directory

The container which will be released is now built as per the container directory.†

† matching the analytical-platform-ui repository.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

1 participant