Skip to content

fix(deps): update dependency async-upnp-client to ^0.42.0 #1595

fix(deps): update dependency async-upnp-client to ^0.42.0

fix(deps): update dependency async-upnp-client to ^0.42.0 #1595

Triggered via pull request October 24, 2023 03:05
Status Failure
Total duration 32s
Artifacts

test-backend.yml

on: pull_request
Matrix: test-backend
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test-backend (3.9)
Process completed with exit code 1.
test-backend (3.10)
The job was canceled because "_3_9" failed.
test-backend (3.10)
Process completed with exit code 1.
test-backend (3.7)
The job was canceled because "_3_9" failed.
test-backend (3.7)
The operation was canceled.
test-backend (3.8)
The job was canceled because "_3_9" failed.
test-backend (3.8)
The operation was canceled.