Skip to content

fix(deps): update dependency async-upnp-client to ^0.42.0 #1579

fix(deps): update dependency async-upnp-client to ^0.42.0

fix(deps): update dependency async-upnp-client to ^0.42.0 #1579

Triggered via pull request October 8, 2023 06:18
Status Failure
Total duration 34s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

test-backend.yml

on: pull_request
Matrix: test-backend
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test-backend (3.10)
Process completed with exit code 1.
test-backend (3.9)
The job was canceled because "_3_10" failed.
test-backend (3.9)
Process completed with exit code 1.
test-backend (3.8)
The job was canceled because "_3_10" failed.
test-backend (3.8)
The operation was canceled.
test-backend (3.7)
The job was canceled because "_3_10" failed.
test-backend (3.7)
The operation was canceled.