feat(light-client): Update contract to trusted setup #1862
Triggered via pull request
December 10, 2024 12:44
Status
Failure
Total duration
1d 17h 36m 46s
Artifacts
–
ci.yml
on: pull_request
Linter
1m 31s
Solidity_Validators_Accumulator_Test
1m 47s
Nim_Light_Client_Clang_Test
9m 24s
Nim_Groth16_Verifier_Tests
6h 0m
Run_Circom_Tests
6h 0m
Run_Plonky2_Tests
10m 48s
Run_Verify_Given_Proof
1m 31s
Run_Verify_Given_Proof_ffJS
5m 42s
Solidity_Verifier_Tests
2m 1s
OneShot_Syncing_Simulation
7m 6s
Build_All
7m 3s
Bash_Scripts_Building_Circom_Circuits
0s
check
4s
Annotations
6 errors
Linter
Process completed with exit code 1.
|
Solidity_Validators_Accumulator_Test
Process completed with exit code 2.
|
Run_Circom_Tests
The job running on runner gpu-server-003-mcl-002 has exceeded the maximum execution time of 360 minutes.
|
Nim_Groth16_Verifier_Tests
The job running on runner gpu-server-003-mcl-001 has exceeded the maximum execution time of 360 minutes.
|
check
Process completed with exit code 1.
|
Bash_Scripts_Building_Circom_Circuits
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
|