Skip to content

Merge #683

Merge #683 #2183

Triggered via push October 28, 2024 09:56
Status Failure
Total duration 1m 17s
Artifacts

tests.yml

on: push
Matrix: tests
Yaml linting check
3s
Yaml linting check
linter-check
15s
linter-check
phpstan-tests
17s
phpstan-tests
integration-tests (PHP 7.4 & Guzzle 6)
1m 4s
integration-tests (PHP 7.4 & Guzzle 6)
Upload coverage to Codecov
0s
Upload coverage to Codecov
Fit to window
Zoom out
Zoom in

Annotations

44 errors
integration-tests (PHP 8.0) (Guzzle-7-Adapter)
Process completed with exit code 2.
integration-tests (PHP 7.4) (PHP-HTTP-CurlClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 7.4) (PHP-HTTP-CurlClient)
Process completed with exit code 2.
integration-tests (PHP 8.3) (PHP-HTTP-CurlClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.3) (PHP-HTTP-CurlClient)
Process completed with exit code 2.
integration-tests (PHP 8.3) (Guzzle-7-Adapter)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.3) (Guzzle-7-Adapter)
Process completed with exit code 2.
integration-tests (PHP 7.4) (Kriswallsmith-Buzz)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 7.4) (Kriswallsmith-Buzz)
Process completed with exit code 2.
integration-tests (PHP 8.1) (Kriswallsmith-Buzz)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.1) (Kriswallsmith-Buzz)
Process completed with exit code 2.
integration-tests (PHP 8.1) (Guzzle-7)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.1) (Guzzle-7)
Process completed with exit code 2.
integration-tests (PHP 8.3) (Kriswallsmith-Buzz)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.3) (Kriswallsmith-Buzz)
Process completed with exit code 2.
integration-tests (PHP 7.4) (Guzzle-7)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 7.4) (Guzzle-7)
Process completed with exit code 2.
integration-tests (PHP 8.3) (Symfony-HttpClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.3) (Symfony-HttpClient)
The operation was canceled.
integration-tests (PHP 8.3) (Guzzle-7)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.3) (Guzzle-7)
The operation was canceled.
integration-tests (PHP 8.2) (Kriswallsmith-Buzz)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.2) (Kriswallsmith-Buzz)
The operation was canceled.
integration-tests (PHP 8.0) (Guzzle-7)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.0) (Guzzle-7)
The operation was canceled.
integration-tests (PHP 8.1) (Guzzle-7-Adapter)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.1) (Guzzle-7-Adapter)
The operation was canceled.
integration-tests (PHP 8.0) (Kriswallsmith-Buzz)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.0) (Kriswallsmith-Buzz)
The operation was canceled.
integration-tests (PHP 8.1) (PHP-HTTP-CurlClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.1) (PHP-HTTP-CurlClient)
The operation was canceled.
integration-tests (PHP 7.4) (Guzzle-7-Adapter)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 7.4) (Guzzle-7-Adapter)
The operation was canceled.
integration-tests (PHP 8.2) (Guzzle-7)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.2) (Guzzle-7)
The operation was canceled.
integration-tests (PHP 8.2) (Guzzle-7-Adapter)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.2) (Guzzle-7-Adapter)
The operation was canceled.
integration-tests (PHP 8.2) (PHP-HTTP-CurlClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.2) (PHP-HTTP-CurlClient)
The operation was canceled.
integration-tests (PHP 8.0) (PHP-HTTP-CurlClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.0) (PHP-HTTP-CurlClient)
The operation was canceled.
integration-tests (PHP 8.2) (Symfony-HttpClient)
The job was canceled because "_8_0_Guzzle-7-Adapter" failed.
integration-tests (PHP 8.2) (Symfony-HttpClient)
The operation was canceled.
integration-tests (PHP 7.4 & Guzzle 6)
Process completed with exit code 2.