Skip to content

chore: updates docs, readme, templates, workflow updates #196

chore: updates docs, readme, templates, workflow updates

chore: updates docs, readme, templates, workflow updates #196

Triggered via pull request October 26, 2023 21:13
Status Failure
Total duration 31m 6s
Artifacts

test.yml

on: pull_request
Matrix: build tests
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
clippy
Process completed with exit code 101.
doc tests
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 30 minutes.
doc tests
The operation was canceled.
feature checks
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 30 minutes.
feature checks
The operation was canceled.
build tests (ubuntu-latest, x86_64-unknown-linux-gnu)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 30 minutes.
build tests (ubuntu-latest, x86_64-unknown-linux-gnu)
The operation was canceled.