Skip to content

Commit

Permalink
Tweak docs
Browse files Browse the repository at this point in the history
  • Loading branch information
longzheng committed Oct 21, 2024
1 parent a2d7920 commit 3667b17
Show file tree
Hide file tree
Showing 2 changed files with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion docs/csip-aus/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -58,6 +58,6 @@ As a direct gateway client, the client requires a device certificate and manufac

### Energex/Ergon Energy

The client has been listed as a compliant provider for Energex/Ergon Energy and the project has been issued a manufacturer certificate for production use.
The client has been listed as a compliant provider for Energex/Ergon Energy and the project is soon to be issued a manufacturer certificate for production use.

A device certificate for Energex/Ergon Energy (Queensland) can be obtained by emailing [email protected]
Binary file added docs/public/favicon.ico
Binary file not shown.

0 comments on commit 3667b17

Please sign in to comment.