Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Replace the Integritee node with our parachain #531

Closed
StamfordDigital opened this issue Apr 22, 2022 · 4 comments
Closed

Replace the Integritee node with our parachain #531

StamfordDigital opened this issue Apr 22, 2022 · 4 comments
Assignees
Labels
D1-feature A new feature, a piece of functionality that needs to be developed I3-high should be completed within 5 working days

Comments

@StamfordDigital
Copy link

StamfordDigital commented Apr 22, 2022

  • Replace the Integritee node with our parachain
  • Apply config changes
  • Check our parachain is up-to-date
@Kailai-Wang
Copy link
Collaborator

Kailai-Wang commented Apr 22, 2022

Check our parachain is up-to-date

This is related to #488 , especially when upstream sgx-runtime and worker were updated to polkadot-v0.9.19 branch already.

@Kailai-Wang
Copy link
Collaborator

Kailai-Wang commented Apr 24, 2022

Maybe this issue could be merged with #481, at least not blocking.

To replace intergritee-node with our parachain, we need to add teerex pallet in our parachain. It can't be replaced without integration of teerex pallet. It's not strictly blocked by #481 either, because to verify if teerex pallet works, we need to use our parachain throughout the CI.

What do you think @StamfordDigital?

Alternatively, we could still keep them separated, but for #481 we are only supposed to (literally) add the pallet and make sure it doesn't break the parachain's CI/CD. In that case, the estimation for #481 can be reduced to 2 days. => I'll prefer this.

@StamfordDigital
Copy link
Author

@Kailai-Wang as mentioned on Slack. I've reduced the estimation for #481 to 2 days.

@Kailai-Wang
Copy link
Collaborator

It's not strictly blocked, but ideally we would start this after the upstream version switch is done: integritee-network/worker#694

@Kailai-Wang Kailai-Wang added I3-high should be completed within 5 working days D1-feature A new feature, a piece of functionality that needs to be developed labels Apr 28, 2022
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
D1-feature A new feature, a piece of functionality that needs to be developed I3-high should be completed within 5 working days
Projects
None yet
Development

No branches or pull requests

2 participants