Skip to content

Update the workflow and the version #7

Update the workflow and the version

Update the workflow and the version #7

Triggered via push October 10, 2024 09:00
Status Failure
Total duration 24s
Billable time 1m
Artifacts

main.yml

on: push
combine-docker
7s
combine-docker
Matrix: build-docker
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 warning
build-docker (ubuntu-20.04, linux/amd64, amd64)
buildx failed with: ERROR: invalid tag "ghcr.io/jobrad-gmbh/postgis:${VERSION}-alpine-amd64": invalid reference format
combine-docker
Error: The process '/usr/bin/docker' failed with exit code 1
build-docker (Linux-ARM64-2C-8GB, linux/arm64, arm64)
The job was canceled because "ubuntu-20_04_linux_amd64_" failed.
build-docker (Linux-ARM64-2C-8GB, linux/arm64, arm64)
The operation was canceled.
build-docker (ubuntu-20.04, linux/amd64, amd64)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/