Fix action #6
custom.yml
on: push
Acceptance Tests
2h 10m
PR checks
21m 18s
Annotations
3 errors
PR checks
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
PR checks
The operation was canceled.
|
Acceptance Tests
Process completed with exit code 2.
|