Skip to content

PHP 8.4

PHP 8.4 #502

Triggered via pull request November 22, 2024 22:01
@dzuelkedzuelke
synchronize #767
php84
Status Failure
Total duration 3m 51s
Artifacts

ci.yml

on: pull_request
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-test (heroku-20)
Process completed with exit code 1.
integration-test (heroku-24)
The job was canceled because "heroku-20" failed.
integration-test (heroku-24)
The operation was canceled.
integration-test (heroku-22)
The job was canceled because "heroku-20" failed.
integration-test (heroku-22)
The operation was canceled.