fa: update fuzzy and untranslated 1.2 #141
You are viewing an older attempt in the history of this workflow run.
View latest attempt.
build.yml
on: push
Matrix: build
Annotations
8 errors
build (ar)
Process completed with exit code 101.
|
build (id)
Process completed with exit code 101.
|
build (pl)
Process completed with exit code 101.
|
build (zh-CN)
The run was canceled by @DannyRavi.
|
build (zh-CN)
The operation was canceled.
|
build (vi)
The run was canceled by @DannyRavi.
|
build (vi)
The operation was canceled.
|
build (zh-TW)
The run was canceled by @DannyRavi.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
comprehensive-rust-bn
|
8.67 MB |
|
comprehensive-rust-da
|
7.81 MB |
|
comprehensive-rust-de
|
7.88 MB |
|
comprehensive-rust-el
|
8.15 MB |
|
comprehensive-rust-en
|
8.37 MB |
|
comprehensive-rust-es
|
8.77 MB |
|
comprehensive-rust-fa
|
8.72 MB |
|
comprehensive-rust-fr
|
8.25 MB |
|
comprehensive-rust-it
|
7.89 MB |
|
comprehensive-rust-ja
|
9.09 MB |
|
comprehensive-rust-ko
|
8.75 MB |
|
comprehensive-rust-pt-BR
|
8.75 MB |
|
comprehensive-rust-ro
|
8.56 MB |
|
comprehensive-rust-ru
|
8.61 MB |
|
comprehensive-rust-tr
|
8.55 MB |
|
comprehensive-rust-uk
|
8.99 MB |
|
comprehensive-rust-vi
|
8.4 MB |
|