Skip to content

Morango Integration Tests #3

Morango Integration Tests

Morango Integration Tests #3

Triggered via schedule November 24, 2024 01:13
Status Failure
Total duration 1m 19s
Artifacts
Path match check
2s
Path match check
Morango Integration Tests with PostgreSQL
1m 1s
Morango Integration Tests with PostgreSQL
Matrix: Morango Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Morango Integration Tests (3.12)
Process completed with exit code 1.
Morango Integration Tests (3.8)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.8)
The operation was canceled.
Morango Integration Tests (3.7)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.7)
The operation was canceled.
Morango Integration Tests (3.6)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.6)
The operation was canceled.
Morango Integration Tests (3.10)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.10)
The operation was canceled.
Morango Integration Tests (3.9)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.9)
The operation was canceled.
Morango Integration Tests (3.11)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.11)
The operation was canceled.
Morango Integration Tests with PostgreSQL
Process completed with exit code 1.