Skip to content

Merge pull request #2 from dirac-institute/awo/parsl-poc #6

Merge pull request #2 from dirac-institute/awo/parsl-poc

Merge pull request #2 from dirac-institute/awo/parsl-poc #6

Triggered via push July 8, 2024 21:58
Status Failure
Total duration 53s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.9)
Process completed with exit code 5.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 5.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
Process completed with exit code 5.
build (3.12)
The job was canceled because "_3_9" failed.
build (3.12)
The operation was canceled.