chore(deps): update postgres docker tag to v17 #3094
build-and-test-on-pr.yml
on: pull_request
Annotations
9 errors and 10 warnings
test-integration (1)
Docker pull failed with exit code 1
|
test-integration (2)
The job was canceled because "_1" failed.
|
test-integration (2)
The operation was canceled.
|
test-integration (5)
The job was canceled because "_1" failed.
|
test-integration (5)
The operation was canceled.
|
test-integration (4)
The job was canceled because "_1" failed.
|
test-integration (4)
The operation was canceled.
|
test-integration (3)
The job was canceled because "_1" failed.
|
test-integration (3)
The operation was canceled.
|
test-integration (1)
Docker pull failed with exit code 1, back off 3.082 seconds before retry.
|
test-integration (1)
Docker pull failed with exit code 1, back off 2.32 seconds before retry.
|
test-integration (2)
Docker pull failed with exit code 1, back off 1.344 seconds before retry.
|
test-integration (2)
Docker pull failed with exit code 1, back off 6.981 seconds before retry.
|
test-integration (5)
Docker pull failed with exit code 1, back off 2.23 seconds before retry.
|
test-integration (5)
Docker pull failed with exit code 1, back off 7.267 seconds before retry.
|
test-integration (4)
Docker pull failed with exit code 1, back off 5.578 seconds before retry.
|
test-integration (4)
Docker pull failed with exit code 1, back off 5.431 seconds before retry.
|
test-integration (3)
Docker pull failed with exit code 1, back off 7.32 seconds before retry.
|
test-integration (3)
Docker pull failed with exit code 1, back off 5.447 seconds before retry.
|