Notifications
You must be signed in to change notification settings - Fork 34
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Merge pull request #52 from gares/platform-release-cycle
[RFC] release cycle
- Loading branch information
Showing
1 changed file
with
196 additions
and
0 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,196 @@ | ||
- Title: Coq and Coq platform release cycle | ||
|
||
- Driver: Enrico | ||
|
||
---- | ||
|
||
# Summary | ||
|
||
We aim at a release process for Coq and the Coq platform which makes it | ||
easier for users to provide feedback and for developers to deliver fixes. | ||
|
||
In a nutshell the *Coq "beta period"* is replaced by a **Coq platform "beta period"**. | ||
Coq devs tag an almost final version on top of which the Coq platform core is | ||
built. Coq point releases are then used to quickly deliver fixes | ||
to the platform. | ||
|
||
# Motivation | ||
|
||
The beta testing period does not provide enough feedback to sensibly improve | ||
Coq between the `VX+beta1` and `VX.0` tags. The reasons are, most important | ||
last: | ||
- users have better things to do, frankly | ||
- one month is short, especially with Christmas, summer holidays or conferences | ||
around (our beta period is December or May) | ||
- in order to test Coq you are likely to need a bunch of Coq packages, and they | ||
are typically only available after the beta period is over | ||
|
||
Moreover the "beta period" has also been seen by devs as a time frame where | ||
they can still change many things. As a result, users are even less happy | ||
to spend time working on a moving target. | ||
|
||
Finally, due to the cost of backporting breaking changes from the master | ||
branch to the release branch, this only happens very early in the release | ||
cycle (for example only 2 such changes were backported in the beta period | ||
for 8.12, 0 for 8.13). | ||
|
||
## New actor: platform | ||
|
||
The Coq platform is a selection of Coq packages which work well | ||
for a given Coq version. One of its objective is to disentangle the release | ||
of Coq with the release of other packages. It provides scripts that build | ||
that selection of Coq packages on Windows, Mac and Linux from sources | ||
on the user's machine, and as well binary installers (prebuilt) for users | ||
to quickly get a working environment. | ||
|
||
**The platform is the final product users will get** in this new model; | ||
Coq is a core component of it. | ||
|
||
# Detailed design | ||
|
||
The new process' timeline: | ||
``` | ||
DO+ O O O O | ||
coq --+---(1)---+------(2)----+----------(3)------------+------+-----+----- | ||
vX branch/ | | | | ||
VX+rc1 tag/ | | | ||
VX.0 tag/ | | ||
VX.1 tag/ | ||
DI DI DI | ||
platform -----------+----(4)------+--------(5)---------+---------------+------- | ||
YYYY.MM branch/ | | | | ||
YYYY.MM+beta tag/ | | | ||
YYYY.MM.0 tag/ YYYY.MM.1 tag/ | ||
Artifacts: | ||
- D = Docker image for Coq (or Coq + the platform) | ||
- O = OPAM package (O+ means for core-dev, otherwise it is for the main OPAM repo) | ||
- I = binary installers for Coq platform | ||
``` | ||
|
||
## Coq | ||
|
||
On time based schedule the RM branches vX. | ||
|
||
1. The RM shepherds the few PRs which are ready, ensures blocker issues are fixed | ||
and pins projects tracked by CI (using commit hashes, not necessarily tags). | ||
The RM generates the Changelog file via the `generate-release-changelog.sh` | ||
script, but leaves the release notes empty (it's the project leader who | ||
fills them in before the .0 release). | ||
This step should take no more than 2 weeks. | ||
- The RM **tags** VX+rc1, but produces no binary installers, see the platform release. | ||
- The RM ensures an **OPAM package** is available, currently the policy is to upload it to | ||
`core-dev`. | ||
- Subsequently, the RM ensures a **Docker image** is available, so that project maintainers can use it | ||
in CI during (4). | ||
|
||
**No breaking change is allowed from now on, unless a severe problem is found.** | ||
2. The documentation is updated (eg. the Changes file) and eventual fixes | ||
required by the platform are done. Ideally no other change is done. | ||
This step should take no more than 2 weeks. | ||
- The RM **tags** the .0 release. | ||
- The RM ensures an **OPAM package** is uploaded to the main OPAM repository. | ||
3. In response to a severe bug report Coq devs make an hotfix in master which is | ||
backported to vX. | ||
- The RM **tags** the point release, possibly as soon | ||
as the fix is available and merged. | ||
- The RM ensures an **OPAM package** is uploaded to the main OPAM repository. | ||
|
||
## Platform | ||
|
||
When Coq VX+rc1 is tagged, the PRM branches YYYY.MM off | ||
|
||
4. Starting with the pins made by RM on Coq's CI all packages part of the | ||
platform (or its core) are pinned (in accordance with upstreams, which are | ||
notified about the ongoing process). Most, if not all, packages are in Coq's | ||
CI or the Platform's CI so there should be no surprises. | ||
This step should not take more than one month. | ||
- The PRM **tags** YY.MM+beta tag and publishes the **binary installers** | ||
- The PRM also ensures a **Docker image** is available with the entire platform prebuilt | ||
5. As users pick up the platform and find severe bugs in Coq, the platform picks | ||
up point releases of Coq containing hotfixes and eventually extends packages | ||
beyond the core set. | ||
|
||
|
||
## Synchronization points | ||
|
||
- The end of (1) starts the release cycle of the platform. | ||
- The end of (2) and (4) don't need to be done at the same time, but if they | ||
are then the release cycle presented in this CEP roughly coincides with the | ||
previous one. Normally (2) precedes (4), but if the doc is not ready yet | ||
the platform can still release a beta. | ||
- Coq's VX.0 tag can be made as soon as the doc is clear. This will stress the | ||
fact that upstreams can pin with no worries as soon as the rc is tagged. | ||
|
||
## Announces | ||
|
||
- Coq tags are only announced to devs | ||
- Coq platform pins are communicated to upstream devs, which may tag/release. | ||
- Coq platform tags and packages **are announced to the community** (this is | ||
when we party) | ||
|
||
## Coq's CI | ||
|
||
For each project P included in the platform: | ||
|
||
- if P has ML code, then it must be tested using the **standard configuration**. | ||
It can also be tested using another configuration. | ||
- if P is pure .v code we have two cases | ||
- if it is a core platform component (has many users in the platform) then it | ||
must be tested using the standard configuration. It can also be tested using | ||
another configuration. | ||
- if it is not a core component, then it can be tested with any configuration, | ||
or not tested at all (it must be tested by the platform's CI anyway) | ||
|
||
The decision of which is the "standard configuration" and the switch to a new | ||
one is subject to discussion between the Coq developers and the platform ones, | ||
and the switch should happen in a coordinated way. | ||
|
||
Moreover, Coq's CI must test: | ||
- a **selection of platform scripts**, to test the script themselves, | ||
not the build of platform packages. Currently the `-extent=i` platform flag | ||
makes it build only Coq+CoqIDE, that should be sufficient. | ||
|
||
Coq's CI can test anything else of course, including non standard | ||
configurations and projects that are not in the platform. | ||
|
||
## Platform CI | ||
|
||
- on branch **YYYY.MM** it must test **all packages** and | ||
build **installers** as artifacts. | ||
This makes the platform release doable without specific hardware (e.g. a Mac | ||
or a PC with windows). | ||
- on branch **master** it should take Coq master and its | ||
**upstream tracked branches** | ||
(for the subset of projects part of the platform) and eventually report the | ||
failures upstream. Currently this activity is logged in dedicated issues. | ||
|
||
### Terminology | ||
- "severe bug" is a bug which *blocks* many users with no decent workaround, | ||
or a soundness bug. | ||
- "hotfix" is a minimal patch that repairs a problem, not necessarily the nice | ||
solution which may require refactoring or cleanups. The patch should pass CI | ||
with no overlay and must be reviewable (in a strict sense, as in looking for | ||
bugs, not just as in "looks reasonable") | ||
- "RM" is the release manager of Coq | ||
- "PRM" are the release managers of the Coq platform | ||
- "standard configuration" is a version of ocaml and other tools which are | ||
agreed between Coq devs and the platform devs (dune, make, gmp, gtk...) as | ||
well as a set of configure options or env variables for Coq (eg enabling or | ||
disabling native_compute, tuning OCaml's GC, tweaking the stack size) | ||
|
||
|
||
### Notes about platform versioning | ||
|
||
It's essentially the Ubuntu scheme: | ||
- YYYY.MM plays the role of a major version, as in Coq's 8.13 | ||
- YYYY.MM.0, YYYY.MM.1 ... play the role of point releases, as Coq's 8.13.0 .. | ||
|
||
Hence, it is not YYYY.MM.DD but rather YYYY.MM.XX. | ||
|
||
# Drawbacks | ||
|
||
This new process identifies 3 groups of developers which need to talk to each | ||
others: Coq dev, platform devs, and Docker devs. This is a risk, but also an | ||
advantage since the Coq release becomes more lightweight, leaving the RM | ||
more time to focus on supporting the release with hotfixes. |