Skip to content

Merge pull request #578 from matheusd/fix-bbr #1013

Merge pull request #578 from matheusd/fix-bbr

Merge pull request #578 from matheusd/fix-bbr #1013

Triggered via push August 6, 2024 20:29
Status Failure
Total duration 2m 26s
Artifacts

go.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Go 1.21 GOARCH=amd64
Process completed with exit code 1.
Go 1.22 GOARCH=amd64
The job was canceled because "_1_21_amd64" failed.
Go 1.22 GOARCH=amd64
Process completed with exit code 1.
Go 1.21 GOARCH=386
The job was canceled because "_1_21_amd64" failed.
Go 1.21 GOARCH=386
The operation was canceled.
Go 1.22 GOARCH=386
The job was canceled because "_1_21_amd64" failed.
Go 1.22 GOARCH=386
The operation was canceled.