Skip to content

DPE-2514 - test: add self-healing after network cut + ip change HA test #540

DPE-2514 - test: add self-healing after network cut + ip change HA test

DPE-2514 - test: add self-healing after network cut + ip change HA test #540

Re-run triggered October 17, 2023 11:17
Status Cancelled
Total duration 1h 42m 41s
Artifacts 2
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yaml

on: pull_request
Build charms  /  ...  /  Get workflow version
4s
Build charms / Get workflow version / Get workflow version
Build charms  /  Collect charms
13s
Build charms / Collect charms
Matrix: Build charms / build
Matrix: integration-test
Matrix: integration-test-ha
Fit to window
Zoom out
Zoom in

Annotations

2 errors
integration-ha
Canceling since a higher priority waiting request for 'Tests-refs/pull/93/merge' exists
integration-ha
The operation was canceled.

Artifacts

Produced during runtime
Name Size
charms-packed-with-cache Expired
17.2 MB
juju-crashdump Expired
426 KB