Skip to content

chore(deps): lock file maintenance #1320

chore(deps): lock file maintenance

chore(deps): lock file maintenance #1320

Triggered via pull request December 21, 2024 16:16
Status Failure
Total duration 1h 9m 47s
Artifacts

ci.yaml

on: pull_request
Matrix: tests-flakes
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
tests-flakes (ubuntu-latest)
Process completed with exit code 1.
tests-flakes (macos-latest)
The job was canceled because "ubuntu-latest" failed.
tests-flakes (macos-latest)
The operation was canceled.
tests (ubuntu-latest)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
tests (ubuntu-latest)
Process completed with exit code 143.
tests (macos-latest)
The job was canceled because "ubuntu-latest" failed.
tests (macos-latest)
The operation was canceled.
tests-flakes (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636