These labs have been built for the setup used in Arista Test Drive composed of the following devices:
- 2 Spine Switches
- Spine1
- Spine2
- 4 Leaf Switches
- Leaf1
- Leaf2
- Leaf3
- Leaf4
- 2 Hosts
- Host1
- Host2
These labs focus on EVPN IRB configurations and concepts.
There are the following labs: