upgrade jwt-scala #770
Triggered via pull request
October 8, 2023 08:40
Status
Cancelled
Total duration
13m 49s
Artifacts
–
check-build-test.yml
on: pull_request
Compile, Code Style, Binary Compatibility
13m 38s
ScalaDoc, Documentation with Paradox
7m 39s
Matrix: connectors
Annotations
7 errors
connectors (sqs, docker-compose up -d elasticmq)
Process completed with exit code 1.
|
connectors (ftp, ./scripts/ftp-servers.sh)
Canceling since a higher priority waiting request for 'ci-refs/pull/257/merge' exists
|
connectors (ftp, ./scripts/ftp-servers.sh)
The operation was canceled.
|
connectors (jms, docker-compose up -d ibmmq)
Canceling since a higher priority waiting request for 'ci-refs/pull/257/merge' exists
|
connectors (jms, docker-compose up -d ibmmq)
The operation was canceled.
|
Compile, Code Style, Binary Compatibility
Canceling since a higher priority waiting request for 'ci-refs/pull/257/merge' exists
|
Compile, Code Style, Binary Compatibility
The operation was canceled.
|