Skip to content

[FLINK-36906] Optimize the logic for determining if a split is finished #779

[FLINK-36906] Optimize the logic for determining if a split is finished

[FLINK-36906] Optimize the logic for determining if a split is finished #779

Re-run triggered December 20, 2024 20:51
Status Failure
Total duration 5m 33s
Artifacts

push_pr.yml

on: pull_request
Matrix: compile_and_test
Matrix: python_test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 6 warnings
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (21)
Process completed with exit code 1.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (11)
The job was canceled because "_21" failed.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (11)
The operation was canceled.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (8)
The job was canceled because "_21" failed.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (8)
The operation was canceled.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (17)
The job was canceled because "_21" failed.
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (17)
The operation was canceled.
python_test (1.20.0) / python_test (8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
compile_and_test (1.20.0, 8, 11, 17, 21) / compile_and_test (21)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636