Updates for project Trekarta and language ru on branch master #312
Triggered via pull request
January 19, 2024 11:11
Status
Failure
Total duration
6h 17m 32s
Artifacts
–
android.yml
on: pull_request
Build
13m 2s
Run Unit Tests
10m 57s
Matrix: Run Instrumentation Tests
Annotations
4 errors
Run Instrumentation Tests (23)
The process '/bin/sh' failed with exit code 1
|
Run Instrumentation Tests (29)
The process '/bin/sh' failed with exit code 1
|
Run Instrumentation Tests (34)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
|
Run Instrumentation Tests (34)
The operation was canceled.
|