Skip to content

ParallelJoin works but require dyn #508

ParallelJoin works but require dyn

ParallelJoin works but require dyn #508

Triggered via push October 20, 2023 21:06
Status Failure
Total duration 5m 48s
Artifacts

check.yml

on: push
Basic Checks
5m 35s
Basic Checks
Additional Builds and Concurrency Tests
3m 43s
Additional Builds and Concurrency Tests
Build and test aggregate circuit
3m 15s
Build and test aggregate circuit
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Build and test aggregate circuit
Process completed with exit code 101.
Additional Builds and Concurrency Tests
Process completed with exit code 101.
Basic Checks
Process completed with exit code 101.
Basic Checks
Process completed with exit code 101.
Basic Checks
Process completed with exit code 1.
Basic Checks
Process completed with exit code 101.