You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
In the MINCO trajectory optimization part, the weight of feasibility cost is quite large (10000). However, the optimized trajectory's acceleration might still exceed the max acc limit. Could you suggest how to handle this problem?
Thanks a lot.
The text was updated successfully, but these errors were encountered:
In the MINCO trajectory optimization part, the weight of feasibility cost is quite large (10000). However, the optimized trajectory's acceleration might still exceed the max acc limit. Could you suggest how to handle this problem?
Thanks a lot.
The text was updated successfully, but these errors were encountered: