Skip to content

Fix tile iterator

Fix tile iterator #23

Triggered via push November 9, 2024 06:43
Status Failure
Total duration 18s
Artifacts

rust.yml

on: push
Matrix: build-metal
Matrix: build-vulkan
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 2 warnings
build-vulkan (ubuntu-latest, stable)
Process completed with exit code 101.
build-vulkan (windows-latest, nightly)
The job was canceled because "ubuntu-latest_stable" failed.
build-vulkan (windows-latest, nightly)
The operation was canceled.
build-vulkan (ubuntu-latest, nightly)
The job was canceled because "ubuntu-latest_stable" failed.
build-vulkan (ubuntu-latest, nightly)
The operation was canceled.
build-vulkan (windows-latest, stable)
The job was canceled because "ubuntu-latest_stable" failed.
build-vulkan (windows-latest, stable)
The operation was canceled.
build-metal (macOS-latest, stable)
Process completed with exit code 101.
build-metal (macOS-latest, nightly)
The job was canceled because "macOS-latest_stable" failed.
build-metal (macOS-latest, nightly)
The operation was canceled.
build-vulkan (ubuntu-latest, stable)
The following actions use a deprecated Node.js version and will be forced to run on node20: hecrj/setup-rust-action@v1. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
build-metal (macOS-latest, stable)
The following actions use a deprecated Node.js version and will be forced to run on node20: hecrj/setup-rust-action@v1. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/