Skip to content

Interim Release

Pre-release
Pre-release
Compare
Choose a tag to compare
@gbarter gbarter released this 29 Jan 23:58

This is an interim release of WEIS that has in place simple controls co-design design optimization capability for floating offshore wind turbines at "Level 3", non-linear time domain simulation with OpenFAST.