Skip to content

Go Test

Go Test #104

Triggered via workflow run June 12, 2024 02:19
@RyuaNerinRyuaNerin
completed 8ea4813
Status Failure
Total duration 5m 6s
Artifacts

go-test.yml

on: workflow_run
Matrix: go-test
Fit to window
Zoom out
Zoom in

Annotations

46 errors
go-test (1.15, ubuntu-latest): aria/asm_amd64.go#L10
no matching versions for query "latest"
go-test (1.15, ubuntu-latest)
Process completed with exit code 1.
go-test (1.22, ubuntu-latest): aria/asm_amd64.go#L10
no required module provides package github.com/RyuaNerin/go-krypto/internal/ptr; to add it:
go-test (1.22, ubuntu-latest)
Process completed with exit code 1.
go-test (1.21, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.18, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.19, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.17, ubuntu-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.17, ubuntu-latest): aria/asm_amd64.go#L10
no required module provides package github.com/RyuaNerin/go-krypto/internal/ptr; to add it:
go-test (1.22, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.17, ubuntu-latest)
Process completed with exit code 1.
go-test (1.20, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.19, ubuntu-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.19, ubuntu-latest): aria/asm_amd64.go#L10
no required module provides package github.com/RyuaNerin/go-krypto/internal/ptr; to add it:
go-test (1.19, ubuntu-latest)
Process completed with exit code 1.
go-test (1.21, ubuntu-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.21, ubuntu-latest): aria/asm_amd64.go#L10
no required module provides package github.com/RyuaNerin/go-krypto/internal/ptr; to add it:
go-test (1.21, ubuntu-latest)
Process completed with exit code 1.
go-test (1.20, ubuntu-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.20, ubuntu-latest): aria/asm_amd64.go#L10
no required module provides package github.com/RyuaNerin/go-krypto/internal/ptr; to add it:
go-test (1.20, ubuntu-latest)
Process completed with exit code 1.
go-test (1.22, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.22, windows-latest)
The operation was canceled.
go-test (1.18, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.19, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.18, windows-latest)
The operation was canceled.
go-test (1.19, windows-latest)
The operation was canceled.
go-test (1.15, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.15, windows-latest)
The operation was canceled.
go-test (1.21, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.21, windows-latest)
The operation was canceled.
go-test (1.16, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.16, windows-latest)
The operation was canceled.
go-test (1.17, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.17, windows-latest)
The operation was canceled.
go-test (1.16, ubuntu-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.16, ubuntu-latest): aria/asm_amd64.go#L10
no required module provides package github.com/RyuaNerin/go-krypto/internal/ptr; to add it:
go-test (1.16, ubuntu-latest)
Process completed with exit code 1.
go-test (1.20, windows-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.20, windows-latest)
The operation was canceled.
go-test (1.17, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.17, macOS, self-hosted)
The operation was canceled.
go-test (1.16, macOS, self-hosted)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.16, macOS, self-hosted)
The operation was canceled.
go-test (1.18, ubuntu-latest)
The job was canceled because "_1_15_ubuntu-latest" failed.
go-test (1.18, ubuntu-latest)
The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.