Skip to content

Backend upgrade.

Backend upgrade. #1

Triggered via push October 11, 2024 10:05
Status Failure
Total duration 24s
Artifacts

backend.yaml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
The job was canceled because "_3_11" failed.
test (3.10)
Process completed with exit code 1.
test (3.12)
The job was canceled because "_3_11" failed.
test (3.12)
The operation was canceled.