Skip to content

Morango Integration Tests #13

Morango Integration Tests

Morango Integration Tests #13

Triggered via schedule October 6, 2024 00:01
Status Failure
Total duration 1m 9s
Artifacts
Path match check
2s
Path match check
Morango Integration Tests with PostgreSQL
51s
Morango Integration Tests with PostgreSQL
Matrix: Morango Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Morango Integration Tests (3.9)
Process completed with exit code 1.
Morango Integration Tests (3.10)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.10)
The operation was canceled.
Morango Integration Tests (3.11)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.11)
The operation was canceled.
Morango Integration Tests (3.7)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.7)
The operation was canceled.
Morango Integration Tests (3.6)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.6)
The operation was canceled.
Morango Integration Tests (3.8)
The job was canceled because "_3_9" failed.
Morango Integration Tests (3.8)
The operation was canceled.
Morango Integration Tests with PostgreSQL
Process completed with exit code 1.