Decision Proposal 117 - Distributed Energy Resources Payload #117

Closed
CDR-API-Stream opened this issue Apr 13, 2020 · 4 comments
Closed

Decision Proposal 117 - Distributed Energy Resources Payload #117

CDR-API-Stream opened this issue Apr 13, 2020 · 4 comments
Labels
Category: API A proposal for a decision to be made for the API Standards made Industry: Electricity This proposal impacts the electricity industry sector Status: No Decision Taken No determination for this decision has been made

Comments

@CDR-API-Stream
Copy link
Contributor

CDR-API-Stream commented Apr 13, 2020

The decision proposal for Distributed Energy Resources data is attached below:
Decision Proposal 117 - Distributed Energy Resources Payloads.pdf

The structures contained in this proposal are based on the data held by AEMO in the DER Register that they maintain. AEMO is the sole designated data holder for these data sets.

Feedback is welcome on this proposal. This thread will remain open for feedback until the 27th of November.

@CDR-API-Stream CDR-API-Stream added Category: API A proposal for a decision to be made for the API Standards made Status: Proposal Pending A proposal for the decision is still pending Industry: Electricity This proposal impacts the electricity industry sector labels Apr 13, 2020
@DSB-RT
Copy link

DSB-RT commented May 6, 2020

For those interested in the Electricity / Energy Sector, please be advised that the Treasury is now seeking views on the draft CDR designation instrument.

https://treasury.gov.au/consultation/consumer-data-right-energy-sector-designation-instrument

@CDR-API-Stream CDR-API-Stream added Status: Feedback Period Closed The feedback period is complete and a final decision is being formulated Status: Open For Feedback Feedback has been requested for the decision and removed Status: Proposal Pending A proposal for the decision is still pending Status: Feedback Period Closed The feedback period is complete and a final decision is being formulated labels Nov 10, 2020
@SelenaLiuEA
Copy link

Good afternoon All,

EnergyAustralia’s comments on the DER register payloads are that the following fields are key and should be mandatory where a value can be returned. They are also data points which in our experience customers find difficult locating.

  • protectionMode - exportLimitkva
  • acConnections – equipmentType, manufacturerName, InverterSeries, inverterModelNumber, commissioningDate, installationStage, status, inverterDeviceCapacity. In particular, manufacturerName and inverterSeries would assist with VPP eligibility identification.
  • derDevices – count, manufacturer, modelNumber, status, installationStage, type, nominalRatedCapacity, nominalStorageCapacity

Other specific comments below:

  • approvedCapacity - There should be a capacity for each technology (example, a 5 kVA battery inverter and 5kVA solar inverter which are coupled through an AC bus behind the meter) and having this information split out would be useful. Perhaps this should say, "approved capacity for technology one" and another field, "approved capacity for technology 2", and another string field saying "technology type 1" (example response "PV") and "technology type 2" (example response "storage - Lithium ION"). This would appear to be the intent of how the payloads should operate – but we wish to confirm this outcome.
  • InstalledPhasesCount – Does this account for all inverter/asset combinations? E.g. a 3 phase solar inverter coupled with a single phase battery.
  • exportLimitkva – Some distributors allow export from one technology type (e.g. solar PV) but not others (e.g. battery). Similar to approvedCapacity, we wish to confirm that different technologies can be split out.
  • derDevices – refers to count which means Number of devices in the group of DER devices, we again raise the point around the splitting out of different technologies under derDevices (for data points that are not common between technologies).

Happy to clarify if any of the above is unclear.

Thanks
Selena

@CDR-API-Stream
Copy link
Contributor Author

Thanks for the feedback Selena. We will validate the feedback with AEMO to determine if they hold the data to accommodate the suggestions made.

@CDR-API-Stream
Copy link
Contributor Author

Feedback on this consultation will now be closed.

@CDR-API-Stream CDR-API-Stream added Status: Feedback Period Closed The feedback period is complete and a final decision is being formulated and removed Status: Open For Feedback Feedback has been requested for the decision labels Nov 30, 2020
JamesMBligh added a commit that referenced this issue Feb 4, 2022
@CDR-API-Stream CDR-API-Stream added Status: No Decision Taken No determination for this decision has been made and removed Status: Feedback Period Closed The feedback period is complete and a final decision is being formulated labels Jul 31, 2022
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
Category: API A proposal for a decision to be made for the API Standards made Industry: Electricity This proposal impacts the electricity industry sector Status: No Decision Taken No determination for this decision has been made
Projects
None yet
Development

No branches or pull requests

3 participants