chore: update to hugr type system refactor #93
ci.yml
on: pull_request
check
9s
benches
3m 47s
Matrix: tests
Annotations
6 errors
check
Process completed with exit code 1.
|
tests (stable, true)
Process completed with exit code 101.
|
tests (beta, true)
The job was canceled because "stable_true" failed.
|
tests (beta, true)
The operation was canceled.
|
tests (nightly, true)
The job was canceled because "stable_true" failed.
|
tests (nightly, true)
The operation was canceled.
|