chore(deps): bump helm.sh/helm/v3 from 3.14.2 to 3.15.3 #227
test.yaml
on: pull_request
Integration Test
2m 43s
K8s Integration Test
3m 29s
Module Integration Test
2m 41s
VM Integration Test
3m 29s
Matrix: Build Test
Matrix: Test
Annotations
12 errors
Build Test (macos-latest)
The process '/Users/runner/hostedtoolcache/goreleaser-action/1.20.0/arm64/goreleaser' failed with exit code 1
|
Build Test (ubuntu-latest)
The job was canceled because "macos-latest" failed.
|
Build Test (windows-latest)
The job was canceled because "macos-latest" failed.
|
Build Test (windows-latest)
The operation was canceled.
|
Test (macos-latest)
Process completed with exit code 1.
|
Test (ubuntu-latest)
The job was canceled because "macos-latest" failed.
|
Test (windows-latest)
The job was canceled because "macos-latest" failed.
|
Test (windows-latest)
The operation was canceled.
|
Integration Test
Process completed with exit code 1.
|
Module Integration Test
Process completed with exit code 1.
|
K8s Integration Test
Process completed with exit code 1.
|
VM Integration Test
Process completed with exit code 1.
|