Skip to content

ci: combine integration tests #26533

ci: combine integration tests

ci: combine integration tests #26533

Triggered via pull request August 27, 2023 20:15
Status Failure
Total duration 36m 11s
Artifacts 1
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
4s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
Matrix: test-docker-build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
getting-started (local-npm)
Process completed with exit code 1.
test-docker-build (test)
Process completed with exit code 124.
test-docker-build (main)
Process completed with exit code 124.

Artifacts

Produced during runtime
Name Size
deployment-test-results-20230827T204812 Expired
421 MB