Prefer project tasks over global tasks in keymappings ("task::Spawn"). #20987
Labels
admin read
Pending admin review
enhancement
[core label]
triage
Maintainer needs to classify the issue
Check for existing issues
Describe the feature
That would be nice if it would be possible to have a global task, for which there would be a keybinding with option to override it for specific project by creation of task with same label.
As for now (zed 0.161.2) global tasks are preferred for "task::Spawn" and there is no obvious way to override them in project.
That will be good if "task::Spawn" would search in project tasks first and then in global tasks.
For example I want to have a global task "build and test" with keybinding for general build, but I need to override it for some projects with different build process.
Environment
Zed: v0.161.2 (Zed)
OS: Linux Wayland fedora 41
Memory: 13.5 GiB
Architecture: x86_64
GPU: AMD Radeon Graphics (RADV RENOIR) || radv || Mesa 24.2.7
If applicable, add mockups / screenshots to help present your vision of the feature
No response
The text was updated successfully, but these errors were encountered: