You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Right now it's difficult to know if the operator has finished reconciling CRD with state of hbase without tailing the logs. This is inefficient, not to mention difficult to find. It is standard for operators to show current status of the CRD (i.e. "Ready", "ApplyingChanges", "Unknown").
Add this to the Hbase CRD that the operator can update on each reconciliation run.
The text was updated successfully, but these errors were encountered:
Right now it's difficult to know if the operator has finished reconciling CRD with state of hbase without tailing the logs. This is inefficient, not to mention difficult to find. It is standard for operators to show current status of the CRD (i.e. "Ready", "ApplyingChanges", "Unknown").
Add this to the Hbase CRD that the operator can update on each reconciliation run.
The text was updated successfully, but these errors were encountered: