Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Test post halt genesis #8

Merged
merged 7 commits into from
Apr 15, 2022

Conversation

agouin
Copy link
Member

@agouin agouin commented Apr 6, 2022

Note: Need 512GB RAM and 64 CPU to run this test

wget http://88.99.65.142/juno-96-dimi.zip
unzip juno-96-dimi.zip -d assets/
go build

./ibc-test-framework test -s juno:v2.3.1 --src-chain-id juno-2 JunoPostHaltGenesis

@jackzampolin
Copy link
Member

This is pretty amazing work, would love to keep this somehow but maybe not in the main line? Maybe in the trophies folder
?

@agouin agouin merged commit e3737f9 into andrew/juno_halt_test Apr 15, 2022
@agouin agouin deleted the andrew/juno_post_halt_genesis branch April 15, 2022 18:27
agouin added a commit that referenced this pull request Apr 15, 2022
* WIP juno halt test

* Should be dir not base

* Fix contract deployment

* use different version for groups of vals

* Dump contract state

* Use correct bad contract

* Remove harcoded juno versions

* Simplify test

* add git ignore

* Test post halt genesis (#8)

* Testing post halt genesis

* replace all instances

* Also replace valcons addresses

* Add juno post halt genesis test for IBC

* Fix gas assertions. Move juno tests to trophies folder. Make relay test end to end (both directions IBC). cleanup (#10)

* Fix gas in timeout tests

* Add custom command to run tests for custom chain configurations (#11)

Co-authored-by: Jack Zampolin <[email protected]>

Co-authored-by: Jack Zampolin <[email protected]>
agouin added a commit that referenced this pull request Apr 15, 2022
* add contract Chain interface methods. implement for wasm. stub out wasm tests

* Reproduce Juno Halt (#7)

* WIP juno halt test

* Should be dir not base

* Fix contract deployment

* use different version for groups of vals

* Dump contract state

* Use correct bad contract

* Remove harcoded juno versions

* Simplify test

* add git ignore

* Test post halt genesis (#8)

* Testing post halt genesis

* replace all instances

* Also replace valcons addresses

* Add juno post halt genesis test for IBC

* Fix gas assertions. Move juno tests to trophies folder. Make relay test end to end (both directions IBC). cleanup (#10)

* Fix gas in timeout tests

* Add custom command to run tests for custom chain configurations (#11)

Co-authored-by: Jack Zampolin <[email protected]>

Co-authored-by: Jack Zampolin <[email protected]>

Co-authored-by: Jack Zampolin <[email protected]>
@faddat
Copy link
Contributor

faddat commented Oct 16, 2022

it's a trophy alright

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants