Production Readiness Review Process

Table of Contents

Release Signoff Checklist

ACTION REQUIRED: In order to merge code into a release, there must be an issue in kubernetes/enhancements referencing this KEP and targeting a release milestone before Enhancement Freeze of the targeted release.

For enhancements that make changes to code or processes/procedures in core Kubernetes i.e., kubernetes/kubernetes, we require the following Release Signoff checklist to be completed.

Check these off as they are completed for the Release Team to track. These checklist items must be updated for the enhancement to be released.

  • kubernetes/enhancements issue in release milestone, which links to KEP (this should be a link to the KEP location in kubernetes/enhancements, not the initial KEP PR)
  • KEP approvers have set the KEP status to implementable
  • Design details are appropriately documented
  • [n/a] Test plan is in place, giving consideration to SIG Architecture and SIG Testing input
  • [n/a] Graduation criteria is in place
  • "Implementation History" section is up-to-date for milestone
  • [n/a] User-facing documentation has been created in kubernetes/website, for publication to kubernetes.io
  • Supporting documentation e.g., additional design documents, links to mailing list discussions/SIG meetings, relevant PRs/issues, release notes

Note: Any PRs to move a KEP to implementable or significant changes once it is marked implementable should be approved by each of the KEP approvers. If any of those approvers is no longer appropriate than changes to that list should be approved by the remaining approvers and/or the owning SIG (or SIG-arch for cross cutting KEPs).

Note: This checklist is iterative and should be reviewed and updated every time this enhancement is being considered for a milestone.

Summary

This proposal introduces a production readiness review process for features merging as alpha or graduating to beta or GA. The review process is intended to ensure that features merging into Kubernetes are observable and supportable, can be safely operated in production environments, and can be disabled or rolled back in the event they cause increased failures in production.

Motivation

Kubernetes has grown quickly and organically. The KEP process introduced a mechanism to help build consensus and ensure the community supports the direction and implementation of various features. It provides a way to document release and graduation criteria, but it leaves that criteria up to the KEP authors and approvers to define. Because these are normally the developers and the SIGs associated with the KEP, there is not always a clear representation of the view of cluster operators. This can result in operational and supportability oversights in the graduation criteria.

This KEP proposes a process to ensure that production concerns are addressed in all new features, at a level appropriate to the features' maturity levels.

Goals

  • Define production readiness criteria for alpha, beta, and GA features.
  • Define a production readiness review gate and process for all features.
  • Utilize existing tooling with prow to enforce the process.

Non-Goals

  • Building new tooling to enforce the process.
  • Provide guidance for specific Kubernetes deployment models. That is, requirements for features should be generally applicable to Kubernetes deployments, not specific to use cases such as single or mult-tenant, cloud provider, on-prem, edge, or other modes.

Proposal

  • Document production readiness criteria in a process document in the kubernetes/community repository. Different levels of readiness may be specified for different feature maturity levels.

  • Develop a production readiness questionnaire to ensure that the feature authors consider and document operational aspects of the feature. The results of this questionnaire will be included in playbook for the feature (the creation of this playbook should be one of the production readiness criteria).

    See current questionnaire.

  • Establish a production readiness review subproject under SIG Architecture, with subproject owners:

    • johnbelamaric
  • Establish a production readiness review team, label, and CI check to prevent the merging of feature promotion PRs that lack production readiness.

Risks and Mitigations

The primary risk is the slowing of feature merges. When this is due to the need for the developers to improve the quality of the feature, that is appropriate. When this is due to lack of bandwidth in the production readiness review team, that is harmful. To mitigate this, the implementation of this process must include a means of:

  • Identifying potential community members for participation in the team
  • A shadow program or other mechanism for preparing those individuals for membership on the team
  • Clear criteria for when one of these individuals is ready to become a full participant
  • Measurement of:
    • Review throughput for production readiness reviews
    • Team bench depth and size

Design Details

Phase 1 - Research and Pilot

  • Targeted to the 1.17 cycle.
  • Setup a pilot PRR team, which will:
    • Deliver an initial PRR questionnaire and pilot it with non-blocking PRRs for in-progress KEPs.
    • Deliver an interview/questionnaire form for operators and interview them on production issues that they experience, to ensure that the focus of this effort is on meaningful problems.
    • Deliver a postmortem summary of existing features that have stalled due to production-readiness issues (e.g., cron jobs).
  • Resolve open questions, including:
    • Should the scope of this expand to feature lifecycle? No, not at this time.
    • How do we measure the effectiveness of this effort?

Status update on Phase 1:

  • Pilot was conducted in 1.17 and 1.18. The questionnaire has been through several revisions and will be required in 1.19 as part of the KEP process.
  • Research was done via a survey, a report on which will be produced, presented to SIG Architecture, and linked in here.
  • Follow-up interviews are in the planning stage as of the beginning of the 1.19 release cycle.
  • Post-mortem of past enhancements has not been completed and is deferred until it is deemed necessary by the subproject team.
  • Effectiveness measurement will come via a regular survey of users.

Phase 2 - Implementation

The questionnaire was put into place in Phase 1, so what remains for Phase 2 is to document the review process and implement the tooling supporting it.

The process will be enforced in the enhancements repository. A separate prod-readiness directory will be maintained, with an OWNERS file with PRR-specific reviewers and approvers. When targeting a release, the KEP author must:

  • Update the kep.yaml, setting the stage, latest-milestone, and the milestone struct (which captures per-stage release versions).
  • Create a prod-readiness/<sig>/<KEP number>.yaml file, with the PRR approver's GitHub handle for the specific stage.

The kepval utility / enhancements CI will be updated to enforce this.

Implementation History

  • 2019-07-31: Created
  • 2019-10-17: Review feedback, phase 1 implementable
  • 2019-11-12: Add establishment of subproject
  • 2020-04-21: Update for phase 2
  • 2020-12-15: Mark implemented, update phase 2 details